
Aquatics, sports & public facilities
Water treatment for shared spaces.
Public facilities can combine high peak demand with multiple water uses. We help select filtration for building services and harvested rainwater, taking account of water quality, operating schedules and maintenance access.
What matters for your facility
- 01
Variable sediment loads in harvested rainwater
- 02
Peak demand during events and busy periods
- 03
Treatment matched to irrigation, amenities or other reuse duties
A considered treatment approach
Step 1
Separate the water uses
Confirm which building or reuse services need treatment and establish the quality target for each.
Step 2
Manage sediment
Consider first flush diversion for roof runoff and screen or bag filtration for the measured solids load.
Step 3
Assess final treatment
Consider finer filtration and UV where the reuse application and source quality require them.
These options address building water and rainwater reuse. They are not a pool circulation or bather-load treatment design; pool treatment requires its own specialist assessment.
Equipment to consider
Examples from our range, subject to application-specific selection.



From our project gallery
All projects

Original project photographs. Equipment examples above are not a project equipment schedule.
Aquatics, sports & public facilities
Discuss your water requirements
Useful information to include
- Water source and intended reuse
- Peak demand and operating schedule
- Sediment and water test results
- Existing tanks, pumps and pipework
Application overview only. Final equipment selection requires water testing, hydraulic design and confirmation of applicable requirements. Physical installation and on-site servicing are currently available in Sydney only.
